Project Brief
In the challenging energy landscape of Yemen, Dawnice delivers a high-performance 100kW PCS and 200kWh battery storage solution to bridge the power gap for local commerce. This project demonstrates our commitment to providing stable, diesel-free energy with the added security of our local technical teams and on-site stock.

Background
Yemen faces chronic power shortages and high fuel costs for diesel generators. For industrial and commercial sectors, energy stability is not just a preference but a necessity for survival. This project aims to provide a reliable “microgrid” for a local enterprise, ensuring seamless production and massive operational cost savings.
Project Highlights
-
Core Configuration: 100kW PCS (Power Conversion System) integrated with a 200kWh DC-Coupled Battery Storage System.
-
High Power Output: The 100kW PCS supports heavy industrial loads and high-power motor startups, providing a stable voltage environment.
-
Optimized DC Coupling: The DC-side battery integration maximizes charging efficiency from solar arrays, reducing conversion losses compared to AC-coupled systems.
-
Rugged Reliability: Specifically engineered for high-temperature and dusty environments, featuring advanced thermal management and a dust-proof enclosure.
-