Commercial Battery Storage Projects
C&I BESS Projects
Project Brief
Driving energy efficiency in the heart of Europe: Dawnice has implemented a 112kWh DC-Side energy storage solution for an industrial leader in Austria. This high-efficiency system is specifically designed to meet rigorous EU standards and perform reliably in alpine climates, ensuring long-term energy independence and cost stability.


Background
With Austria’s commitment to “#mission2030” for 100% renewable electricity, local enterprises are rapidly adopting energy storage to mitigate high peak-load charges. This industrial facility required a high-efficiency DC-Side system to integrate with their existing large-scale solar array, ensuring maximum energy retention and grid stability.
Project Highlights
-
Core Configuration: 112kWh Dawnice DC-Side Battery. By connecting directly to the DC side, the system minimizes energy conversion losses (DC-AC-DC), increasing overall round-trip efficiency by 3-5%.
-
European Standard Compliance: Fully certified under IEC 62619 and CE standards, meeting Austria’s strict safety and grid connection requirements.
-
Advanced Thermal Management: Equipped with an intelligent heating and cooling system, ensuring the lithium cells operate at optimal temperatures even during Austrian alpine winters (down to -20°C).
-
Modular Scalability: The 112kWh unit features a modular design, allowing the client to expand capacity easily as their production lines grow.