Commercial Battery Storage Projects
C&I BESS Projects
Project Brief
Dawnice successfully completed a 600kWh commercial and industrial energy storage system project in Estonia. The system, consisting of three 200kWh Dawnice C&I solar battery cabinets, provides local businesses with an efficient and reliable clean energy solution.

Video
Background
In Estonia, businesses faced challenges with fluctuating electricity prices and the risk of power outages. To address these issues, we designed and installed a tailored energy storage solution that enables both on-grid and off-grid operations, ensuring continuous power supply even during disruptions.
Project Highlights
-
3 x 200 kWh High-Voltage Battery Storages
This configuration ensures high capacity and reliability to meet local business needs. -
Flexible On-Grid and Off-Grid Operation
The system supports both grid-connected and off-grid modes, allowing businesses to operate seamlessly during power disruptions. -
Efficient Energy Management System (EMS)
The intelligent EMS optimizes energy consumption, taking advantage of off-peak electricity prices while ensuring stable power supply. -
Guaranteed 24/7 Stable Power Supply for Businesses
The system ensures businesses enjoy uninterrupted power, protecting critical operations.
Dawnice is dedicated to providing professional, safe, and innovative energy storage solutions globally, helping businesses achieve sustainable energy independence.






